Recent Project
Recently I was able to work on the Mitsubishi Mirage project with Ralliart
This vehicle was stripped down to the bones, and re-built, customizing everything from the suspension, installing roll bars though to changing it to Left hand drive so our over seas drivers can arrive and jump straight in.
In this project I was responsible for the refitting of the roof, windscreen, side windows and rear plastic screen specifically designed and made for the rear wing to attach to the chassis through the screen.
As you can see form the photos below this was no small job taking about 8 months to design and build. Working closely with Out "N" About the staff knew that the job would be done right and done right the first time. Baz always takes pride in completing the job to a higher than expected level.

